Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| articles:those_who_fail_to_plan [2020/05/01 05:01] – rrandall | articles:those_who_fail_to_plan [2021/09/29 23:44] (current) – rrandall | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| + | ====== Those who fail to plan... ====== | ||
| + | |||
| + | I’ve found that the old adage of “[[https:// | ||
| + | |||
| + | {{ : | ||
| + | |||
| + | As a Quality Management System (QMS) auditor and consultant, I’ve visited many companies during my career… including several Fortune 500 companies. And I've observed that MANY of the nonconformities identified, whether internally or from external QMS auditors, have similar root causes. This is so common that some “Corrective Action” software databases include a selection of “typical” root causes in a “Drop-Down List” - presumably in a misguided effort to assist management in creating Pareto charts to identify the " | ||
| + | |||
| + | When Root Cause Analysis (RCA) is reduced to simply identifying the proper “Drop-Down List” selection, it becomes obvious that the difference between "// | ||
| + | |||
| + | One of the best and most effective tools for performing a structured RCA is the Ishikawa Fishbone chart (shown below). Fishbone charts typically categorize problems through the 6 Ms (Manpower, Materials, Measurements, | ||
| + | |||
| + | {{ : | ||
| + | |||
| + | And Fishbone charts are commonly used as a structured approach to identifying " | ||
| + | |||
| + | |||
| + | Had a series of PFMEAs (Process Failure Mode and Effects Analysis) been completed during the planning stage, virtually all of the "root causes" | ||
| + | |||
| + | Very few of the companies I've visited have ever performed any PFMEAs as part of their planning. IF they had, then the costs associated with their product returns, customer complaints, and performing individual Root Cause Analysis (RCAs) and Corrective Actions would have been dramatically reduced. This is especially true when "// | ||
| + | |||
| + | Below are some common examples of " | ||
| + | |||
| + | ^ Category | ||
| + | | Personnel | ||
| + | | ::: | Training not updated to stay aligned with process changes (e.g., new equipment) | ||
| + | | ::: | Instructor Knowledge / Competence (Lack of a "Train the Trainer" | ||
| + | | ::: | Trainee Comprehension / Understanding (Lack of, or inadequate testing) | ||
| + | | ::: | Trainee Competence (Ineffective demonstration of competence) | ||
| + | | ::: | Requirements not communicated (due to ineffective communication between functions & Personnel) | ||
| + | | Materials | Incorrect material received - due to incorrect specifications communicated to the supplier | ||
| + | | ::: | Incorrect material received - due to inadequate control of changes to orders | ||
| + | | ::: | Incorrect material received - due to unauthorised substitution | ||
| + | | ::: | Nonconforming material received - due to inadequate material acceptance inspection requirements | ||
| + | | ::: | Nonconforming material received - due to no acceptance inspection/ | ||
| + | | ::: | Nonconforming material - due to incorrect, incomplete, or missing identification | | ||
| + | | ::: | Nonconforming material - due to improper handling packaging (damage) | | ||
| + | | ::: | Nonconforming material - due to improper storage of materials (damage or spoilage) | | ||
| + | | ::: | Nonconforming material - due to Material shelf life exceeded | | ||
| + | | Measurements | ||
| + | | ::: | Tolerances are specified, but not achievable with existing equipment | | ||
| + | | ::: | Inadequate performance measurement and assessment | | ||
| + | | ::: | Process Capability is unknown | | ||
| + | | Equipment | ||
| + | | ::: | Equipment not under a Preventive Maintenance Program | ||
| + | | Methods | ||
| + | | ::: | Procedures/ | ||
| + | | ::: | Procedures/ | ||
| + | | ::: | Inadequate recall/ | ||
| + | | Environment | ||
| + | | ::: | Temperature and/or humidity requirements not defined for material(s) and/or process(es) | ||
| + | | ::: | Temperature and/or humidity requirements exceeded but not being monitored or reported | ||
| + | | ::: | Foreign Object Debris / Damage (FOD) | | ||
| + | |||
| + | So why isn't your company performing PFMEAs... or equivalent risk assessments? | ||
| + | |||
| + | |||

