Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
articles:ocap-complexity [2023/06/20 16:05] rrandallarticles:ocap-complexity [2023/06/20 16:10] (current) rrandall
Line 7: Line 7:
  
 <WRAP center round info 80%> <WRAP center round info 80%>
-The AS91041A, "//Figure 2 - Organization complexity risk level//" simply expands [[https://iaf.nu/en/iaf-documents-categories/|IAF MD5 Determination of Audit Time for QMS-EMS-OHS Audits]], "//Figure QMS 1 – Relationship between Complexity and Audit Time//" by adding "Risk Levels.+The AS9104/1A, "//Figure 2 - Organization complexity risk level//" simply expands [[https://iaf.nu/en/iaf-documents-categories/|IAF MD5 Determination of Audit Time for QMS-EMS-OHS Audits]], "//Figure QMS 1 – Relationship between Complexity and Audit Time//" by adding "Risk Levels.
 </WRAP> </WRAP>
  
Line 15: Line 15:
 central function (not necessarily the headquarters of the organization) at which central function (not necessarily the headquarters of the organization) at which
 certain processes/activities are planned and controlled, and a number of sites certain processes/activities are planned and controlled, and a number of sites
-(permanent, temporary or virtual) at which such processes/activities are fully or+(permanent, temporaryor virtual) at which such processes/activities are fully or
 partially carried out.</blockquote> partially carried out.</blockquote>
 +
 +The remaining ambiguous descriptors (e.g., small vs. large, few vs. many) are left to the CBs to define. However, the CBs that I work with define a "large" organization as one having over 200 workers. If curious as to how your CB has made this determination, ask them.
  
 {{page>wiki:pathforward}} {{page>wiki:pathforward}}