Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| articles:value_added_audits [2023/07/19 02:59] – [Definitions] rrandall | articles:value_added_audits [2023/07/19 03:00] (current) – [Definitions] rrandall | ||
|---|---|---|---|
| Line 34: | Line 34: | ||
| The eight lean manufacturing wastes, mostly derived from the TPS (Toyota Production System), have a universal application to businesses today. The acronym for the eight wastes is DOWNTIME. | The eight lean manufacturing wastes, mostly derived from the TPS (Toyota Production System), have a universal application to businesses today. The acronym for the eight wastes is DOWNTIME. | ||
| + | |||
| + | ---- | ||
| {{ : | {{ : | ||
| + | |||
| + | ---- | ||
| + | |||
| ===== Preparing for a Value-Added Audit ===== | ===== Preparing for a Value-Added Audit ===== | ||
| [[ https:// | [[ https:// | ||

